Mine Production, Operation And Optimization For Limestone Project – PT. Gita Perkasa Mineralindo

This project was started on 13 January 2020 to 31 December 2022. The main objective of this project was purposed to optimize the production rate and costs. The initial program was aimed to investigate the potential issues that may affect the production rate and costs. Since the production rate can be optimized that the cost […]
Mine Production & Grade Control, Construction, Mine Planning & Cost Control For Nickel Project- PT. Erabaru Timur Lestari

ThIs project was started by construction for the main hauling road, stockpile and jetty to support the operation. Then, the ore production was proposed from Block 3. The mine design was developed based on the economic ore grade distribution to extract of 1.80% nickel grade. This project has been successful to extract the nickel ore […]
The Preliminary Exploration & Valution For Nickel Laterite Project – PT. Gunung Api Indonesia

This project carried out the regional exploration to investigate the potential economic nickel laterite deposit. The desktop review was purposed to identify the source rocks, climate, topography, structure, tectonic and drainage that can be used as a guide in interpreting the potential nickel laterite deposit enrichment. The source rocks were sampled to identify the rock […]