Mine Production & Grade Control, Construction, Mine Planning & Cost Control For Nickel Project- PT. Erabaru Timur Lestari

Mine Production & Grade Control, Construction, Mine Planning & Cost Control For Nickel Project- PT. Erabaru Timur Lestari

ThIs project was started by construction for the main hauling road, stockpile and jetty to support the operation. Then, the ore production was proposed from Block 3. The mine design was developed based on the economic ore grade distribution to extract of 1.80% nickel grade. This project has been successful to extract the nickel ore with the grade of 1.80% with the optimal costs.